DON MUEANG (VTBD) A-CDM TRIAL OPERATION WILL TAKE PLACE 20 FEBRUARY 2019 TO 20 MAY 2019 – Daily

A0488/19 – DON MUEANG A-CDM TRIAL OPERATION WILL TAKE PLACE AT DON MUEANG AIRPORT FROM 20 FEBRUARY 2019 TO 20 MAY 2019 FROM 2200 TO 0500 UTC

DAILY.

  • DEPARTURE FLIGHTS FROM DON MUEANG AIRPORT WITH EOBT FROM 2200 TO 0500 UTC ARE REQUIRED TO PARTICIPATE IN THE TRIAL OPERATION.
  • AIRCRAFT OPERATOR (AO) / GROUND HANDLER (GH) ARE TO REPORT AND UPDATE TOBT (TARGET OFF-BLOCK TIME) BY IDEP WEB-BASED APPLICATION  (WWW.AEROTHAI.AERO) OR BY SMS VIA DIGITAL TRUNKED RADIO SYSTEM.
  • TARGET START-UP APPROVAL TIME (TSAT) WILL BE CALCULATED AND DISTRIBUTED TO AIRCRAFT OPERATOR (AO) / GROUND HANDLER (GH) VIA THE SAME REPORTING CHANNELS AS TOBT.
  • PILOT SHALL ENSURE THAT THE AIRCRAFT WILL BE READY AT TOBT FOR  START-UP AND PUSH BACK. IN CASE OF SELF-MANEUVERING AUTHORIZED BY AIRPORT AUTHORITY, THE AIRCRAFT SHALL BE READY TO PUSH BACK THEN TAXI OR TAXI OUT FROM PARKING STAND.
  • PILOT SHALL CONTACT GROUND CONTROL FOR START UP AND PUSH BACK WITH IN TSAT WINDOW (+/- 5 MINS).
  • IF PILOT CONTACT GROUND CONTROL FOR START-UP AND PUSH BACK AFTER TSAT WINDOW, TSAT WILL BE EXPIRED. PILOT SHALL NOTIFY TO AO/GH TO UPDATE THE TOBT FOR A NEW TSAT.
  • FOR DETAILED INFORMATION AND MANUAL, PLEASE CONTACT AT BKK.ACDM AT AEROTHAI.CO.TH. DLY 2200-0500, 20 FEB 22:00 2019 UNTIL 20 MAY 05:00 2019.

CREATED: 20 FEB 07:13 2019